Welding Quality Control Engineer

Welding Quality Control Engineer [OBS denna annons har utgått]

Annons: 29093155
Yrke: Kontrollingenjör
Arbetsgivare: Gemkom Engineering & Machinery Filial
Arbetets ort: Boden, Norrbottens län
Senaste ansökningsdatum: 2024-10-11
Publiceringsdatum: 2024-09-11



Presentation:


Gemkom Engineering and Machinery Filial is a newly established branch of the Turkish company Gemkom. It is a leading engineering and manufacturing company that operates in a number of areas and in various ways within the steel industry.

We will participate in a project where H2GS AB (H2 Green Steel) establishes a steel mill in Norra Svartbyn in Boden, where steel will be produced through an almost fossil-free process using hydrogen gas. Our mission is, among other things, to install machines used in steel production and includes work in mechanics, electronics and plumbing.

We now want to employ an Welding Quality Control Engineer. The work tasks may include but are not limited to:

JOB DESCRIPTION

Preparing WPS,PWPS documents, contacting 3.Part Companies which are licensed /accredited for (GTAW-SMAW-GMAW-SAW-FCAW ) welding PQR preparations

Preparing Welding Map – Project Weld Report (Initial and Production)

Weld maps/WPS log Preparation

Post Welding Heat Treatment and Pre -Welding Heat Treatment Inspection and Guidance

Guidance and Preparation of below Quality Control Documents

UT Ultrasonic Testing

MT Magnetic Particle Testing

VT Visual Testing

PT Penetrant Testing

Inspection Test Plan (ITP) Preparation

Inspect Welding Joint Preparations and Welding Quality by Sampling

Review of Project Welding Report, giving trainings to Welders in order to achieve the targeted max Weld Rejection Rate

Making Walk Through audits preparation of Mechanical Completion Documents

Control of Welding Consumables

Preparation of Pipe Line(Oil/Gas/Fluid) /Pressure Vessel Welding Control Reports and Inspection Test Plans

Preparing PWPS (Pre Welding Process Specification), WPS (Welding Process specifications) ,

Preparing Draft PQR (Process Qualification Record), WQR(Welder Qualification Record) Preparation knowledge .

Preparing /Collecting / Preserving the necessarily documents for finishing the electirification related documents after each related Handover/Completion Process (dossier of QC )

QUALIFICATIONS

Having an International Welding Engineer Diploma/Certificate

Having no obstacles to reside in Boden Construction Site (accommodation, transportation and food will be provided by employer)

Project Finish Date Target October 2026

Having at least 5 years of Pipe Line(Oil/Gas/Fluid) /Pressure Vessel Welding Experience PWPS (Pre Welding Process Specification), WPS (Welding Process specifications) ,PQR (Process Qualification Record), WQR(Welder Qualification Record) Preparation knowledge .

Inspection Test Plan (ITP) Preparation knowledge and experience

Ability to read Technical Drawings (Welding Symbols)

Having NDT Non-Destructive Test level 2 Certificate covering below Test Methods

ASNT (American Society for Non Destructive Testing) Level 2 /Or ISO EN 9712 NDT level 2 (Valid Certificate )

UT Ultrasonic Testing

MT Magnetic Particle Testing

VT Visual Testing

PT Penetrant Testing

Microsoft Office Program Knowledge (Good knowledge of Excel is preferred)

Steel Structure Erection Experience (Torque Control etc..) is preferred

Knowledge and ability to follow ASME,AWS,ASTM and ISO Standards Related Welding and Steel Structure) (ASME Section VIII and IX BOILER AND PRESSURE CODE)

Knowledge of PT According to ASTM Section V and VIII BOILER AND PRESSURE CODE)

Knowledge of PED 2014/68/EU Annex I Section 3.0 and EN 13445-5

Knowledge AMERICAN WELDIND SOCIETY D1.1 Structural Welding Code EN 13445-4

Knowledge RT According to ASTM Section V and VIII BOILER AND PRESSURE CODE)

Knowledge PED 2014/68/EU Annex I Section 3.0 and EN 13445-5

Familiar with weld maps/WPS log Preparation

Capable of Preparing Welding Map – Project Weld Report (Initial and Production)

Familiar with different Welding Techniques like (GTAW-SMAW-GMAW-SAW-FCAW) as well as Electrodes and Filler Wires

Experience with Mechanical Completion Document Preparation and Walk Through Audits.